Live Sync Active — Eng. Calculators → Quotation
12kW Hybrid — 22 panels · 2 batteries · Synced at 10:28:00 PM
👤
Company & Client Details
FDG Solar Visayas
Renewable Design and Build
0915 1983 899 · fmguinoo@gmail.com
⚙️
System Configuration & Financial Summary
📦
Interactive Bill of Materials
Component Specification / Notes Qty Unit Price (₱) Line Total
₱123,500.00
₱112,700.00
₱276,000.00
₱1,500.00
🔩 Mounting System ₱20,500.00
🔌 Electrical & BOS ₱29,500.00
👷 Professional Labor ₱84,000.00
System Sizer & Energy Flow Engine
Complete Steps 1–5 below — Step 6 auto-calculates and live-syncs to Quotation Generator
LIVE SYNC
1 Electrical Phase & Voltage
2 System Architecture
3 Consumption Input Basis
4 Energy Value Input
Derived: 955.4 kWh / month
Daily Equivalent = 31.85 kWh
5 Load Profile — Day / Night Split
6 Energy Flow Visualization
Daytime Load vs Solar
Solar covers day usage
7.96 kWh/day
Solar Offset
Required Battery Storage
Daily — usable (night+surge) · gross = usable ÷ DOD → bank sizing
23.89 kWh usable · 29.86 kWh gross
Night Load
Surge Reserve
Monthly Savings: 955.4 kWh/mo  ·  Day: 7.96kWh · Night+Surge: 23.89kWh usable (29.86kWh gross @ 80% DOD)
Recommended Configuration
⚡ Inverter
12kW @ 48V
48V Hybrid On/Off-Grid
☀ PV Array
22 × 550W panels
12.10 kWp total
🔋 Battery Bank
2× 48V 300Ah
600Ah @ 48V — 28.80 kWh gross — delivers 23.89 kWh @ 82.9% DOD (TOLERABLE)
💰 Estimated Investment
₱639,000.00
ℹ️ Battery: 23.89kWh usable need → 2× 48V 300Ah = 600Ah / 28.80kWh gross @ 82.9% DOD (TOLERABLE). Bank cost ₱276,000.
🔄 ✅ Quotation synced — 12kW Hybrid/Off-Grid system, 22 panels, 2 batteries · Last synced: 10:28:00 PM
🔋
Battery Chemistry & DOD
Applied to all battery calculators below
Battery Runtime
🔋
Required Battery Sizing
PV Array Sizer
🔌
Breaker Sizer
Add New Hardware Item
📋
Current Inventory
SORT BY: 20 items · click any field to edit
Internal Name ⇅ Client Spec Price ⇅ Actions
AC Breaker (1P/2P) System Base Pricing ₱450
AC Breaker (3P/4P) System Base Pricing ₱1,200
AC SPD System Base Pricing ₱650
Aluminum Rail (pc) System Base Pricing ₱480
ATS System System Base Pricing ₱2,200
Battery Cable Set System Base Pricing ₱1,500
Battery DC MCCB Breaker 225A System Base Pricing ₱2,500
Copper Grounding Rod 2.5 System Base Pricing ₱1,000
DC Breaker System Base Pricing ₱750
DC SPD System Base Pricing ₱1,000
End Clamp System Base Pricing ₱80
Grounding Lug System Base Pricing ₱75
L-Foot / Roof Hook System Base Pricing ₱65
MC 4 Connectors Pair System Base Pricing ₱250
Mid Clamp System Base Pricing ₱80
Panel Box (Large) System Base Pricing ₱2,500
Panel Box (Small) System Base Pricing ₱1,500
PV Wire 6mm² (m) System Base Pricing ₱140
Roof Tile Aluminum Rail (pc) System Base Pricing ₱400
Splice Kit System Base Pricing ₱140
🎯
Kanban Board
Drag cards to change stage. Red border = stale (14+ days inactive).
Total Quotes
1
✅ Successful
0
⏳ Pending
1
💰 Total Revenue (Successful)
₱0
📋
Saved Quotations
Click a row to load it back. Use status to track conversion.
Ref #ClientDateSystemAmountStatusActions
FDGS-260502-155 Sheryl Castillo Solis 2026-05-01 8kW Hybrid (On/Off-Grid + Battery) ₱400,000.00
🏗️
Transparent EPC Pricing Logic
How we calculate industry-standard mounting and labor costs for a typical 5kW system
Mounting Hardware (₱1,500 / Panel)
ComponentEst. Cost
Aluminum Rails (Anodized)₱600
Roof Attachments (L-Feet/Hooks w/ EPDM)₱400
Fasteners & Sealants (Sikaflex, Tekscrews)₱200
Clamps & Grounding₱300
Total per Panel₱1,500
Professional Labor (₱7,000 / kW)
Allocation (Based on 5kW / 3 Days)Est. Cost
Lead Engineer / Electrician₱9,000
Skilled Roofers & Helpers₱14,000
Sign-offs & Testing₱5,000
Logistics, Meals & Consumables₱7,000
Total for 5kW System₱35,000
📊
ROI & Savings Calculator

Lead